| YEAR |
DATE |
TITLE |
DOWNLOAD |
| 2008 |
|
|
|
| |
09/08 |
TELECOMS 08 Conference,
Olympia, LONDON
UNIFIED COMMUNICATIONS - Stretching the infrastructure
Presented by Mike Gilmore
on behalf of Mike Daly, CMA Infrastructure Forum
and Head of Unified Communications, HSBCGroup
|
|
| |
09/08 |
TELECOMS 08 Conference,
Olympia, LONDON
EN 50174: 2008 and its impact in the UK
|
|
| |
07/08 |
BICSI Pub Night
THE SECOND COMING Updated European (i. e. British) Installation Standards
for 2008
|
|
| |
05/08 |
BICSI MIDDLE EAST
Conference
SPECIFYING CABLING INFRASTRUCTURES 2010
|
|
| |
05/08 |
BICSI MIDDLE EAST
Workshop
SPECIFYING CABLING INFRASTRUCTURES 2010
|
|
| |
02/08 |
CEN-CENELEC-ETSI-ANSI
Conference - Interoperability: Key to International Business: Warsaw
HOMES AND BUILDINGS -THE GOAL OF INTEGRATION
|
|
| |
01/08 |
AUA TELECOMS Conference
-University of Leicester
CABLING FOR 10GBASE- T AND BEYOND - A Tangled Web
|
|
| 2007 |
|
|
|
| |
03/07 |
Innovation and Market
Access through Standards - German Presidency of the European Union
2007
MICE - the development of a universal concept in standardization in
the face of industry protectionism
|
|
| 2006 |
|
|
|
| |
03/06 |
BICSI Conference
- Barcelona
IS 10 Gb COPPER REALLY COST EFFECTIVE IN DATA CENTRES?
|
|
| |
11/01/06 |
AUA TELECOMS Conference
-Royal Holloway University London
ARE YOU GETTING THE TELECOMMS INFRASTRUCTURE YOU DESERVE or “Why
do we bother writing standards?”
|
|
| 2005 |
|
|
|
| |
28/10/05 |
Data Center Dynamics
Conference, London
WORKING GROUP: CABLING INFRASTRUCTURE |
|
| |
12/04/05 |
AUA TELECOMS Conference
- UCL
BS 6701: 2004 - THE “ONE- STOP- SHOP” INSTALLATION STANDARD
|
|
| 2004 |
|
|
|
| |
11/04
|
DATA CENTRE CABLING
STANDARDSandNEW TECHNOLOGY OVERVIEWfor2005
Data Center Dynamics Conference, London |
|
| |
11/04
|
DOTTING THE
isandCROSSING THE ts
Cabling Standards 2005
Molex Premise Networks, Ardencote Manor, Warwickshire |
|
| |
09/04
|
TESTING INSTALLED
CABLING - they know not what they do!
FIA CAW Seminar, London and Manchester, UK |
|
| |
06/04
|
STRUCTURED CABLING
FOR INDUSTRIAL PREMISES - the CATS meet the MICE
Chitose, Japan |
|
| |
06/04
|
STRUCTURED CABLING
FOR INDUSTRIAL PREMISES - the CATS meet the MICE
BICSI Conference, Brussels, Belgium |
|
| |
05/04
|
SPECIFICATION OF
FUSION SPLICE LOSS
FIA CAW Seminar, London and Manchester, UK |
|
| |
05/04
|
A FRESH LOOK AT GIGABIT
ETHERNETIN DATA CENTRES
Molex Premise Networks, Various locations, UK |
|
| |
05/04
|
BS 6701:2004. -A
USERS PERSPECTIVE
Molex Premise Networks, Various locations, UK |
|
| |
05/04
|
BS 6701:2004. -THE
INSTALLERS PERSPECTIVE
Molex Premise Networks, Various locations, UK |
|
| |
03/04
|
INFRASTRUCTURE ADMINISTRATION
- STANDARDS AND PRACTICES
TIA (UK) SIG 2 Meeting |
|
| 2003 |
|
|
|
| |
09/03 |
MARGINAL PERFORMANCE
AND INSTALLER PROFITS
BICSI Conference, Birmingham, UK |
|
| |
02/03 |
OFFICES, HOMES AND
FACTORIES-IS AN INTEGRATED CABLING SOLUTION POSSIBLE?
BICSI Conference, London, UK |
|
| |
01/03 |
THE PAPERLESS INSTALLATION
-THE e-TOOLS REVOLUTION
London, UK |
|
| |
01/03 |
STAND OUT FROM THE
CROWD
FIA Seminar, London, UK
|
|
| 2002 |
|
|
|
| |
11/02 |
THE PAPERLESS INSTALLATION
ECA ITEC SEMINAR, IoD, London, UK |
|
| |
11/02 |
THE CHALLENGE OF
THE NEW OPTICAL FIBRE TECHNOLOGIES
ECA ITEC SEMINAR, IoD, London, UK |
|
| |
09/02 |
THE PAPERLESS INSTALLATION
ECA ITEC SEMINAR, Birmingham, UK |
|
| |
09/02 |
THE CHALLENGE OF
THE NEW OPTICAL FIBRE TECHNOLOGIES
ECA ITEC SEMINAR, Birmingham, UK |
|
| |
07/02 |
THE GREAT ESCAPE,
London, UK |
|
| |
05/02 |
STAND OUT FROM THE
CROWD
FIA Seminar, Bisham Abbey, UK
|
|
| |
03/02 |
TESTING OPTICAL FIBRE
INFRASTRUCTURES
FIA Seminar, Bisham Abbey, UK
|
|
| 2001 |
|
|
|
| |
12/01 |
DARK FIBRE - DO USERS
KNOW WHAT THEY ARE GETTING?
FIA Breakfast Seminar, Bisham Abbey, UK |
|
| |
11/01 |
STANDARDS PRIMER,
London, UK |
|
| |
11/01 |
TESTING TIMES AHEAD,
London, UK |
|
| |
10/01 |
TESTING MULTIMODE
OPTICAL FIBRE CABLING
FIA Breakfast Seminar, Bisham Abbey, UK
|
|
| |
10/01 |
A NEW GENERATION
OF OPTICAL FIBRE COMPONENTS
FIA Breakfast Seminar, Edinburgh, UK
|
|
| |
07/01 |
TRENDS IN BUSINESS
AND IT INFRASTRUCTUIRE
Bailey Telecom, Wantage, UK |
|
| |
05/01 |
AS ONE DOOR CLOSES,
Honeywell, Various locations, UK |
|
| |
03/01 |
CABLING AT THE CROSSROADS
Molex Premise Networks, Various locations, UK
|
|
| |
03/01 |
TESTING OPTICAL FIBRE
INFRASTRUCTURES
FIA Breakfast Seminar, Bisham Abbey, UK
|
|
| |
03/01 |
THE NEW OPTICAL FIBRE
CATEGORIES
FIA Breakfast Seminar, Bisham Abbey, UK
|
|
| |
03/01 |
THE END IS NIGH,
London, UK |
|
| 2000 |
|
|
|
| |
12/00 |
PUBLISH OR BE DAMNED,
London, UK |
|
| |
11/00 |
I.T. CABLING TRENDS
- UPDATE, London, UK |
|
| |
03/00 |
MANAGING THE FUTURE
byCONTROLLING THE PRESENT
ITT Network Systems and Services, London, UK |
|
| |
03/00 |
LIGHT AT THE END
OF THE TUNNEL, London, UK |
|
| |
01/00 |
HIGH BIT RATE OPTICAL
FIBRE NETWORKS, London, UK |
|
| 1999 |
|
|
|
| |
12/99 |
MIND THE GAP, London,
UK |
|
| |
02/99 |
DATA CABLING - CRAWLING
OUT OF THE MELTING POT, London, UK |
|
| 1998 |
|
|
|
| |
11/98 |
REVISED STANDARDS
FOR INSTALLED CABLING AND THIE IMPACT ON TESTING, BICSI Conference,
Dusseldorf, Germany |
|
| |
07/98 |
DATA CABLING - STILL
IN THE MELTING POT, London, UK |
|
| |
03/98 |
DATA CABLING - BACK
INTO THE MELTING POT, London, UK |
|